The site visit that changed a floor plan
A single afternoon on-site overturned three weeks of drawings. We don't consider that time wasted.

Introduction
The drawings were nearly final when we walked the site one more time before permitting.
What Changed
An oak we’d marked for removal turned out to be the only afternoon shade on the whole lot. We redrew the west wing around keeping it.
The Principle
No drawing is final until the site has had one more chance to argue with it.