Materials

Oct 2025 · 4 min

Why concrete needs twenty-eight days

Twenty-eight days is not a suggestion. It's the minimum time concrete needs to reach the strength we design against.

Introduction

Every pour on an Obsidian site is followed by twenty-eight days of nothing — no load, no rushing.

The Chemistry

Concrete keeps curing long after it looks finished. At twenty-eight days it reaches roughly the strength our structural calculations assume. Earlier than that, we’d be building on a promise, not a fact.

The Discipline

Clients ask why we can’t speed this up. We can’t, and we wouldn’t if we could.

Journal

Oct 2025 · 4 min

Create a free website with Framer, the website builder loved by startups, designers and agencies.