Studio

Feb 2025 · 5 min

What we learned from a flooded basement

A basement we built flooded in its second year. We didn't blame the weather — we found our own mistake first.

Introduction

The call came eighteen months after handover. Standing water, four inches, after a week of heavy rain.

The Investigation

Our grading plan had assumed a drainage rate the actual clay soil couldn’t support. It was our error, not the client’s, and not the weather’s.

The Fix

We now soil-test every site ourselves before finalizing grading, regardless of what the civil survey says.

Journal

Feb 2025 · 5 min

Create a free website with Framer, the website builder loved by startups, designers and agencies.